Daily news

 
BULGARIA'S DOBRINISHTE SKI ZONE PROJECT KICKS OFF
16:36 Fri 19 Oct 2007
 

Orbel Development AD, the company to build and complete the Dobrinishte Ski Zone project, hailed on October 18 in Dobrinishte the start of the project, Dnevnik business daily reported on October 19 2007.

The company, a joint venture between Austria's Norema tourist holding and Bulgarian developer Galchev Engineering Group, had procured all regulatory nods.

Orbel has been registered as a company as of September 26 2007.

The ski zone was to cover 2000 hectares, where ski runs and adjoining facilities would have an aggregate length of 22 500 m. The multi-seat cabin lift, to interconnect Dobrinishte and Gotse Delchev hut, would be 6 km long.

About 13 000 m of the ski runs and facilities would traverse state property and another 9 000 m – municipal property. The new ski runs would be 19 km long and the existing ones about 6 800 m. The complex would also have 39 km in tourist tracks and create opportunities for biking and other types of tourism.

The cabin lift and the skiing infrastructure alone were said to need 40 million euros in investments, the statement reads.
On completion, the hotel complex was set to have 10000 bed capacity.

 
Printer friendly version
 
 
 
 
Custom Search
Free Daily News Alerts
BNB Fixing 05 Sep 2008
EUR1.4488USD
EUR0.8086GBP
EUR1.95583BGN
USD1.34997BGN
GBP2.40569BGN
 
 
 
Download first page